Submitted to the City Prosecutor and the City
THE COMPLETE GATE-SAFETY SUBMISSION.
This packet documents the only egress pathway, the inward opening gate, the locks, repeated obstruction, and the history of notice.
Open submitted packet →The exit was used to terrorize
The problem isn’t that he locked me out. It’s that he locked me in.
The only route to the street was a keyed, inward-opening gate that should have been self-closing.
The governing inspection guide identifies two different critical conditions on the same page. Missing or nonfunctioning smoke and carbon monoxide detectors are Unit Critical. An exit gate that does not swing in the direction of travel, is not self-closing, or cannot be opened from inside without a key, special knowledge, or effort is Premises Critical.
Submitted to the City Prosecutor and the City
This packet documents the only egress pathway, the inward opening gate, the locks, repeated obstruction, and the history of notice.
Open submitted packet →